Skip to content
Demo site built by Zaim. Sample content.Back to Zaim's portfolio

Sustainability ·

Padang Lembayung solar park delivers first power

The 180 megawatt park takes Baskara's solar capacity to 800 megawatts and reaches full output by the end of 2026.

Padang Lembayung, Baskara's largest solar park to date, has delivered first power to the grid. The 180 megawatt park will ramp up in stages and is expected to reach full output by December 2026.

With Padang Lembayung, Baskara's solar capacity reaches 800 megawatts, alongside 620 megawatts already operating across five sites in Peninsular Malaysia.

The group aims to reach 3 gigawatts of renewable capacity by 2030 and to raise the share of capital expenditure in low-carbon businesses to 20 percent.